News

KRUCH on tour

KRUCH on tour

Shortly before the end of the year, it´s time for us to get down to business. In November, you have the chance to meet the KRUCH team three times in person: 08. - 09.11.2018: ÖVG Congress in the Technical Museum in Vienna The congress takes place under the main topic...

read more
KRUCH is a member of Trolleymotion and UITP

KRUCH is a member of Trolleymotion and UITP

We are glad to be admitted Regular visitors to our website may have noticed the small change in the lower margin. KRUCH can now present itself as a proud member of trolley:motion (the association for trolley buses) and of UTIP (the international association for public...

read more
KRUCHs HKL-02: Revolution of hangerclamps

KRUCHs HKL-02: Revolution of hangerclamps

Production and sale figures have been doubling almost every year since 2015 HKL-02, our hanger clamp without crimping or crimp sleeve, kicked off a real revolution upon its entry onto the market. Even though precisely this initially drew some sceptical looks, HKL-02...

read more
InnoTrans 2018

InnoTrans 2018

We are live again! On the 18th September it is time again. The InnoTrans 2018 starts in a new round. Of course, the KRUCH team is once again a guest at the leading international trade fair for traffic technology this year! „The KRUCH team will once again be taking the...

read more
Kruch in media: Innovative catenary mast (FLM)

Kruch in media: Innovative catenary mast (FLM)

In cooperation with Carl Ritter from Ghega Institute for "Institut für integrierte Mobilitätsforschung" of university of St. Pölten We are prowd to present our catenary mast in the press now. Read the whole story in the article of the "Ingenieur Spiegel" here. (german...

read more
Railway Level Crossing Solution for wide loads

Railway Level Crossing Solution for wide loads

Railway level crossing solution from KRUCH for wide loads The catenary masts with stable design are already available as complete system for cantilevers and tensioning systems. The advantages of our catenary mast systems in detail: No disassembly of the overhead line...

read more
Energy Flow Simulation EFS now also in Germany

Energy Flow Simulation EFS now also in Germany

KRUCHs dynamic mathematic model of traffic system will be available in Germany, Potsdam very soon. The Energy Flow Simulation “EFS“ will optimize a part of the tramway traffic in the region. With the help of „EFS“ KRUCH wants to pursure the following project goals:...

read more