<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Signaling Technology | KRUCH</title>
	<atom:link href="https://kruch.com/en/category/signaling-technology/feed/" rel="self" type="application/rss+xml" />
	<link>https://kruch.com/en/</link>
	<description>Railway Innovations</description>
	<lastBuildDate>Thu, 22 Sep 2022 09:03:22 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://kruch.com/wp-content/uploads/2019/06/cropped-favicon1-kruch-32x32.png</url>
	<title>Signaling Technology | KRUCH</title>
	<link>https://kruch.com/en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Kruch achieves one of the largest orders in the company&#8217;s history</title>
		<link>https://kruch.com/en/kruch-erzielt-mit-streckensignalen-einen-der-groessten-auftraege-in-der-unternehmensgeschichte/</link>
					<comments>https://kruch.com/en/kruch-erzielt-mit-streckensignalen-einen-der-groessten-auftraege-in-der-unternehmensgeschichte/#respond</comments>
		
		<dc:creator><![CDATA[Rudolf Stadler]]></dc:creator>
		<pubDate>Mon, 29 Jun 2020 10:35:29 +0000</pubDate>
				<category><![CDATA[Signaling Technology]]></category>
		<guid isPermaLink="false">http://wp.kruch.com/kruch-erzielt-mit-streckensignalen-einen-der-groessten-auftraege-in-der-unternehmensgeschichte/</guid>

					<description><![CDATA[With the current installation of trackside signals, the modernisation of the Graz Köflacher Bahn is entering the next round. This year, KRUCH is already supplying the second tranche of completely pre-assembled trackside signals. That´s not all &#8211; the complete demand on the planned lines amounts to an average of 30 pieces/year over a total of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>With the current installation of trackside signals, the modernisation of the Graz Köflacher Bahn is entering the next round. This year, KRUCH is already supplying the second tranche of completely pre-assembled trackside signals. That´s not all &#8211; the complete demand on the planned lines amounts to an average of 30 pieces/year over a total of 10 years and is therefore one of the largest orders in the history of KRUCH.</p>
<p>&#8220;We are very pleased to be able to actively participate in such large modernization projects. This allows us to make an important contribution to future-oriented safety technology with our traditional company,&#8221; says Josef Datzreiter, KRUCH CEO.</p>
<p>The framework agreement signed with DPB GmbH in 2019 sealed the deal. The planned measures will continue until 2029.</p>
<p>If you would like to find out more, please feel free to contact us at <a href="mailto:sales@kruch.com" target="_blank" rel="noopener noreferrer">sales@kruch.com</a>. We look forward to an interesting discussion with you.</p>
<p><img decoding="async" src="https://www.kruch.com/media/images/news/gro%C3%9Fauftrag-st%C3%B6rer-en.jpg" alt="" width="250" height="90" /></p>
]]></content:encoded>
					
					<wfw:commentRss>https://kruch.com/en/kruch-erzielt-mit-streckensignalen-einen-der-groessten-auftraege-in-der-unternehmensgeschichte/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>InnoTrans 2018</title>
		<link>https://kruch.com/en/innotrans-2018/</link>
					<comments>https://kruch.com/en/innotrans-2018/#respond</comments>
		
		<dc:creator><![CDATA[Rudolf Stadler]]></dc:creator>
		<pubDate>Fri, 07 Sep 2018 15:30:01 +0000</pubDate>
				<category><![CDATA[Catenary]]></category>
		<category><![CDATA[EFS]]></category>
		<category><![CDATA[Mobility 4.0]]></category>
		<category><![CDATA[Signaling Technology]]></category>
		<guid isPermaLink="false">http://wp.kruch.com/?p=6121</guid>

					<description><![CDATA[On the 18th September it is time again. The InnoTrans 2018 starts in a new round. Of course, the KRUCH team is once again a guest at the leading international trade fair for traffic technology this year!]]></description>
										<content:encoded><![CDATA[<h2>We are live again!</h2>
<p>On the 18th September it is time again. The InnoTrans 2018 starts in a new round. Of course, the KRUCH team is once again a guest at the leading international trade fair for traffic technology this year!</p>
<p>„The KRUCH team will once again be taking the trade fair events from the visitors&#8217; perspective this year. Each year, InnoTrans is the opportunity for us to exchange with industry specialists and introduce our new products. We are looking forward to interesting discussions!“, says KRUCH CEO Jan Röhl.</p>
<h3>Since InnoTrans 2014</h3>
<p>The „SMA“ signal mast, which was exhibited in full size at InnoTrans 2014, celebrated its „world premiere“ at that time. With the Energy-Flow-Simulation „EFS“, KRUCH presented a tool with which after a few minutes of training the most important situations can be simulated and evaluated in the railway technology every day. The numerous new developments in the field of catenary components underpin the claim of KRUCH to be one of the leading specialists in this product field. This year, the focus will be on the latest KRUCH product: the Trolleybus Checkpoint</p>
<p>Would you like to talk to us at InnoTrans 2018? Contact us at <a href="mailto:sales@kruch.com">sales@kruch.com</a>.<br />
<a href="https://www.kruch.com/en/productsandservices/" target="_blank" rel="noopener noreferrer">Find out more about our products and services here.</a></p>
]]></content:encoded>
					
					<wfw:commentRss>https://kruch.com/en/innotrans-2018/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Signal mast with integrated service lift successful on the track in Germany</title>
		<link>https://kruch.com/en/signal-mast-with-integrated-service-lift-successful-on-the-track-in-germany/</link>
					<comments>https://kruch.com/en/signal-mast-with-integrated-service-lift-successful-on-the-track-in-germany/#respond</comments>
		
		<dc:creator><![CDATA[Rudolf Stadler]]></dc:creator>
		<pubDate>Thu, 06 Oct 2016 14:39:25 +0000</pubDate>
				<category><![CDATA[Signaling Technology]]></category>
		<guid isPermaLink="false">http://wp.kruch.com/?p=7227</guid>

					<description><![CDATA[The first SMAs are delivered and installed.]]></description>
										<content:encoded><![CDATA[<h2>Signal mast with integrated service lift successful on the track in Germany</h2>
<h2><video controls="controls" width="300" height="150" data-mce-fragment="1"></video></h2>
<p><img decoding="async" src="https://www.kruch.com/media/images/news/teaser-sma02-en.png" alt="signal mast with integrated service lift" width="350" height="125" /></p>
<p>The first SMAs are delivered and installed. After intensive development in recent years, we are now ready for series production.<br />
The new signal mast with integrated service lift is the future-oriented solution for maintenance of railway signals:</p>
<ul>
<li>Increases the availability of your routes</li>
<li>Enables quick response to signal failures</li>
<li>Comfortable and safe working</li>
<li>Complies with safety regulations</li>
<li>Replaces mobile working platforms during signal maintenance</li>
</ul>
<p>For more information please visit our <a href="https://www.kruch.com/de/produkteunddienstleistungen/signalmaste/sma-02aufstiegshilfenachruestungfuermaste" target="_blank" rel="noopener noreferrer">product page </a>or send us your inquiry to <a href="mailto:sales@kruch.com">sales@kruch.com</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://kruch.com/en/signal-mast-with-integrated-service-lift-successful-on-the-track-in-germany/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>KRUCH &#8211; success story</title>
		<link>https://kruch.com/en/kruch-success-story/</link>
					<comments>https://kruch.com/en/kruch-success-story/#respond</comments>
		
		<dc:creator><![CDATA[Rudolf Stadler]]></dc:creator>
		<pubDate>Tue, 04 Oct 2016 15:06:41 +0000</pubDate>
				<category><![CDATA[Catenary]]></category>
		<category><![CDATA[EFS]]></category>
		<category><![CDATA[Signaling Technology]]></category>
		<guid isPermaLink="false">http://wp.kruch.com/?p=7243</guid>

					<description><![CDATA[Many multinational companies share one small detail in their history: It all started with a small idea.]]></description>
										<content:encoded><![CDATA[<section class="inhalt">
<article>
<h2 class="vorspann">Many multinational companies share one small detail in their history: It all started with a small idea. Step by step, the ideas lead to huge success. KRUCH is proud of this part of the company’s history.</h2>
<p class="vorspann">It all began in these buildings in the 12th municipal district of Vienna 147 years ago (picture taken in 1983). On the way of growth and success, KRUCH changed headquarter location a few times.</p>
<p>Even then KRUCH developed and produced their own products such as chimney pots and pressure cookers. A few of the production machines, such as the 650t friction screw press which was invented by the Scherb brothers, are still in use these days. These reliable machines conduce to KRUCHs success story.</p>
<p>CEO Jan Röhl feels both melancholy and pride, while looking back at this time. &#8220;My parents absorbed the business from the Kruch family in 1980. Engineer Karl Kruch worked with them for a while, he was such a genius academic talent. My father was able to improve the companys success even more. He ramped up the railway business, developed the first patented products and convinced the customers by reliability and quality despite the fact that the available resources were simple.&#8221;</p>
<p>Our team grew big and got international in the last decades. We develop and produce future-oriented railway products, latest computer simulations (f.e. the Energy-Flow-Simulation &#8211; EFS) and take the internet of things to the railway infrastructure (f.e. the state remote monitoring of catenary components). The concept is very simple, so Jan Röhl: &#8220;Listen to the customer’s needs, develop and produce really simple, fast and safe products, which facilitate the customer’s work processes and increase the route availability.&#8221;</p>
<p>&#8220;Our products open new markets and opportunities in the railway sector. In the last years our innovations like the <a href="https://www.kruch.com/en/productsandservices/signalmastsystems/" target="_blank" rel="noopener noreferrer">signal mast with lift (SMA)</a>, the <a href="https://www.kruch.com/en/productsandservices/catenarycomponents/hangerclamps/hkl-02clampwithoutthimbleconnection/" target="_blank" rel="noopener noreferrer">hanger clamp (HKL-02)</a> or the <a href="https://www.kruch.com/en/productsandservices/efssimulationsoftware/" target="_blank" rel="noopener noreferrer">Energy-Flow-Simulation (EFS)</a> enjoyed huge response by stakeholders worldwide.”, Jan Röhl says.</p>
<p>The 147 years of KRUCH history show impressively, how enthusiasm and a great team can lead to great success in a &#8220;small&#8221; family business.</p>
</article>
</section>
<div class="sidecontent">
<div class="lightboxContent"></div>
</div>
]]></content:encoded>
					
					<wfw:commentRss>https://kruch.com/en/kruch-success-story/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>KRUCH SMA-event &#8211; Interview with CEO Jan Röhl</title>
		<link>https://kruch.com/en/kruch-sma-event-interview-with-ceo-jan-roehl/</link>
					<comments>https://kruch.com/en/kruch-sma-event-interview-with-ceo-jan-roehl/#respond</comments>
		
		<dc:creator><![CDATA[Rudolf Stadler]]></dc:creator>
		<pubDate>Sun, 02 Oct 2016 10:38:18 +0000</pubDate>
				<category><![CDATA[Catenary]]></category>
		<category><![CDATA[Signaling Technology]]></category>
		<guid isPermaLink="false">http://wp.kruch.com/?p=7257</guid>

					<description><![CDATA[On the 2nd of July, KRUCH invited groups of interest to the first in-house exhibition at the headquarters in Vienna.]]></description>
										<content:encoded><![CDATA[<h2>DI (FH) Jan Röhl at the interview</h2>
<p>On the 2nd of July, KRUCH invited groups of interest to the first in-house exhibition at the headquarters in Vienna. DI (FH) Jan Röhl, director of KRUCH, talked about this exciting event and future perspectives.</p>
<p><strong>KRUCHs in-house exhibition &#8211; Presentation of SMA (Signal Mast System)</strong></p>
<p>On the 2nd of July, KRUCH invited potential customers and groups of interest to the first in-house exhibition at the headquarters in Vienna. DI (FH) Jan Röhl, director of KRUCH, talked about this exciting event.</p>
<p><strong>Mr. Röhl, why did this SMA-event happen?<br />
</strong>After five years of development, numerous prototypes and extensive tests of the signal mast system it was time to present our invention to potential customers and groups of interest. Therefor an in-house exhibition at our manufacturing base in Vienna is a great possibility. The time is ripe to show the market the benefits of SMA.</p>
<p><strong>What program was to be expected?</strong></p>
<p>First of all, we talked about the development of the SMA. Especially about the meaning of SMA for the operators. Afterwards every guest had the chance to try SMA out on their selves to experience the benefits of occupational safety. For me the best moment was when participants who tested the cab started brainstorming about possible steps to accelerate putting SMA into operation.</p>
<p><strong>What did the participants get to see?</strong></p>
<p>At our headquarters, we operate and test several SMA in different versions. Additionally, we presented a few short films, for example “<a href="https://www.kruch.com/media/videos/kruch-sma-winterstorm.mp4" target="_blank" rel="noopener noreferrer">Exchanging a signal in snow storm conditions</a>”. We also visited our manufacturing lines. For the customers this is the most exciting part of the event. Highly-automated robotics and highly qualified craftsman and craftswoman, producing the reliable products, our customer worship.</p>
<p><strong>Why is the signal mast system meaningful?</strong></p>
<p>It takes time till the ETCS-Level 2 (European Train Control System) is available on a large scale, in the meantime we need block signals that are operating reliably. With SMA a signal technician is able to exchange a signal within only five minutes. That means, just between regular train frequency. The overhead contact line doesn’t need to be switched off and it is absolutely safe and comfortable.</p>
<p><strong>What do you predict for the future of SMA?<br />
</strong>Laws and regulations for the protection of employees in dangerous environment just as railway infrastructure are getting stricter and stricter. get improved continuously to prevent accidents and personal injury.<br />
At the same time railway companies need to keep the train moving efficiently to achieve the aim of people and transports in time. A rail-range, that needs to detour or stop their trains for maintenance or repair work, is less efficient and losing money.<br />
SMA is the instrument that enables achieving both aims.<br />
For these reasons, I think, a lot of railways will deploy SMA for increasing safety of track signals maintenance, the rout performance, thereby boosting efficiency and profitability of the railway increases. We’re going to produce thousands of SMAs.</p>
<p><strong>Are you planning more events like this?<br />
</strong>Of course we want to organise more of these happenings. Till now we don´t have any fixed date but if anybody is interested, feel free to contact <a href="mailto:sales@kruch.com" target="_blank" rel="noopener noreferrer">sales@kruch.com</a>. Also visit our <a href="https://www.kruch.com/en/company/News/" target="_blank" rel="noopener noreferrer">website </a>regulary to get the information you need.</p>
<p><strong>Mr. Röhl, thanks for the interview!</strong></p>
]]></content:encoded>
					
					<wfw:commentRss>https://kruch.com/en/kruch-sma-event-interview-with-ceo-jan-roehl/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		<enclosure url="https://www.kruch.com/media/videos/kruch-sma-winterstorm.mp4" length="27161350" type="video/mp4" />

			</item>
		<item>
		<title>Signal mast with service lift successfully in use</title>
		<link>https://kruch.com/en/signal-mast-with-service-lift-successfully-in-use/</link>
					<comments>https://kruch.com/en/signal-mast-with-service-lift-successfully-in-use/#respond</comments>
		
		<dc:creator><![CDATA[Rudolf Stadler]]></dc:creator>
		<pubDate>Thu, 29 Sep 2016 09:39:08 +0000</pubDate>
				<category><![CDATA[Signaling Technology]]></category>
		<guid isPermaLink="false">http://wp.kruch.com/?p=7280</guid>

					<description><![CDATA[The first SMA have been delivered and installed. ]]></description>
										<content:encoded><![CDATA[<h2>Simply quick and safe</h2>
<p>The first SMA have been delivered and installed.</p>
<p><video controls="controls" width="300" height="150" data-mce-fragment="1"></video></p>
<p><img decoding="async" src="https://www.kruch.com/media/images/news/stoerer-en-web.png" alt="Increases track availability and protects your workers" width="280" height="100" /></p>
<p>After intensive development in recent years we are now ready for series production. The new signal mast with integrated climbing aid is the future oriented solution for maintenance of railway signals.</p>
<ul>
<li>Increases the availability of your routes</li>
<li>Enables quick response to signal failures</li>
<li>Comfortable and safe working</li>
<li>Complies with safety regulations</li>
<li>Replaces mobile working platforms during signal maintenance</li>
</ul>
<p>For more information visit our <a href="https://www.kruch.com/de/produkteunddienstleistungen/signalmaste/sma-02aufstiegshilfenachruestungfuermaste" target="_blank" rel="noopener noreferrer">product page</a> or contact us at <a href="mailto:sales@kruch.com" target="_blank" rel="noopener noreferrer">sales@kruch.com</a></p>
]]></content:encoded>
					
					<wfw:commentRss>https://kruch.com/en/signal-mast-with-service-lift-successfully-in-use/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>First SMA-mast successfully installed</title>
		<link>https://kruch.com/en/first-sma-mast-successfully-installed/</link>
					<comments>https://kruch.com/en/first-sma-mast-successfully-installed/#respond</comments>
		
		<dc:creator><![CDATA[Rudolf Stadler]]></dc:creator>
		<pubDate>Mon, 14 Dec 2015 11:03:19 +0000</pubDate>
				<category><![CDATA[Signaling Technology]]></category>
		<guid isPermaLink="false">http://wp.kruch.com/?p=7298</guid>

					<description><![CDATA[After 5 years of development and many large and small steps the first two "SMA - 02: lifts for retrofitting to signal masts" were successfully installed.]]></description>
										<content:encoded><![CDATA[<p>After 5 years of development and many large and small steps , on Saturday, 12th of december 2015, the first two &#8220;<a href="https://www.kruch.com/en/productsandservices/signalmastsystems/sma-02liftrefittingformasts/">SMA &#8211; 02: lifts for retrofitting to signal masts</a>&#8221; were delivered and successfully installed in Peggau/ Graz.</p>
<p>Thanks to the KRUCH SMA mast to safer, faster and more comfortable place maintenance and repair in the future.</p>
<p>&#8220;We are very proud that the long-term development is now showing signs of success and very confident that the first few weeks are already showing good results. &#8221; says Jan Röhl, General Manager of KRUCH.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://kruch.com/en/first-sma-mast-successfully-installed/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>KRUCH at the Nordic Rail 2015</title>
		<link>https://kruch.com/en/kruch-at-the-nordic-rail-2015/</link>
					<comments>https://kruch.com/en/kruch-at-the-nordic-rail-2015/#respond</comments>
		
		<dc:creator><![CDATA[Rudolf Stadler]]></dc:creator>
		<pubDate>Tue, 15 Sep 2015 10:09:22 +0000</pubDate>
				<category><![CDATA[Catenary]]></category>
		<category><![CDATA[EFS]]></category>
		<category><![CDATA[Signaling Technology]]></category>
		<guid isPermaLink="false">http://wp.kruch.com/?p=7306</guid>

					<description><![CDATA[KRUCH presents a world-first at the planet′s biggest trade fair for railway technology. The Signal Mast with Built-In Ascent Support "SMA" helps you to maximize your networks availability and the safety of you signal maintenance staff.]]></description>
										<content:encoded><![CDATA[<p>On the 6th to 8th of october 2015, the Nordic Rail fair in Jönköping will open its doors. Visitors will be greeted by the latest products and services from various railway-related areas.</p>
<h2>Signal Mast with Built-In Ascent Support &#8211; SMA</h2>
<p>KRUCH presents a world-first at the planet′s biggest trade fair for railway technology. The <strong>Signal Mast with Built-In Ascent Support &#8220;SMA&#8221;</strong> helps you to maximize your networks availability and the safety of you signal maintenance staff.</p>
<p><a href="https://www.kruch.com/en/productsandservices/signalmastsystems/sma-01signalmastwithlift">Find out more about this product</a><em><br />
</em></p>
<h2>Innovative Catenary Components</h2>
<p><strong>Various innovations in catenary components</strong> underline KRUCH′s claim for being one of the leading specialists in this field. One example which proves this is the &#8220;world′s most quickly adjustable dropper system&#8221;.</p>
<p><a title="Catenary Components" href="https://www.kruch.com/en/productsandservices/catenarycomponents">More on KRUCH catenary components</a></p>
<h2>Energy Flow Simulation</h2>
<p>Our <strong>Energy Flow Simulation &#8220;EFS&#8221;</strong> gives you the right tool to simulate and evaluate the most important situations on a daily basis &#8211; and it only needs a few minutes of training! Provided with this tool, you will simulate changes in train schedules, electrical parameters, sub-station parameters, car parameters and more to identify weaknesses and load limits, and many more.</p>
<p><a title="EFS" href="https://www.kruch.com/en/productsandservices/efssimulationsoftware">More on KRUCH EFS</a></p>
<h2>Innovative Steel Catenary Masts</h2>
<p>We deliver <strong>catenary masts from steel</strong>,</p>
<ul>
<li>that need to be no longer than 6m and not heavier than 230kg</li>
<li>where you can install a cantilever without crane and</li>
<li>adjust the height position without working platforms.</li>
</ul>
<h4>Visit us! Click <a href="https://www.elmia.se/en/nordicrail/" target="_blank" rel="noopener noreferrer">here</a> for more information.</h4>
]]></content:encoded>
					
					<wfw:commentRss>https://kruch.com/en/kruch-at-the-nordic-rail-2015/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>KRUCH-contest &#8211; Do you know where the signal mast is?</title>
		<link>https://kruch.com/en/kruch-contest-do-you-know-where-the-signal-mast-is/</link>
					<comments>https://kruch.com/en/kruch-contest-do-you-know-where-the-signal-mast-is/#respond</comments>
		
		<dc:creator><![CDATA[Rudolf Stadler]]></dc:creator>
		<pubDate>Tue, 12 May 2015 10:28:23 +0000</pubDate>
				<category><![CDATA[Signaling Technology]]></category>
		<guid isPermaLink="false">http://wp.kruch.com/?p=7320</guid>

					<description><![CDATA[The KRUCH signal pole with integrated service lift is a new revolutionary concept, where the maintenance people – riding on an electro-hydraulic platform – are lifted up to their site of operation to service the signals in a height of 5 m to 7 m above ground.]]></description>
										<content:encoded><![CDATA[<p>The KRUCH signal pole with integrated service lift is a new revolutionary concept, where the maintenance people – riding on an electro-hydraulic platform – are lifted up to their site of operation to service the signals in a height of 5 m to 7 m above ground. Compared to common methods for servicing signals the service time will be minimised, the safety at work will be vastly improved and vehicle-skylifts will not be needed anymore.</p>
<h4>Spotted one Signal from kruch in an unusual place. Do you know where it is?</h4>
<p>Send the correct answer to <a href="mailto:office@kruch.com">office@kruch.com</a> and be the prowd winner of a great price!</p>
<p>&nbsp;</p>
<h4>Thanks for joining the KRUCH contest! The correct answer is:</h4>
<p>The signal mast is located in the Vienna Technical Museum!</p>
<h3></h3>
<h3>And the winner is&#8230;<span class="null"><br />
</span></h3>
<p><span class="null">Ms. Liftenegger! She won a ticket to the Vienna Technical Museum!<br />
</span></p>
<h3>Congratulations!</h3>
]]></content:encoded>
					
					<wfw:commentRss>https://kruch.com/en/kruch-contest-do-you-know-where-the-signal-mast-is/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Exchanging a signal in snow storm conditions</title>
		<link>https://kruch.com/en/exchanging-a-signal-in-snow-storm-conditions/</link>
					<comments>https://kruch.com/en/exchanging-a-signal-in-snow-storm-conditions/#respond</comments>
		
		<dc:creator><![CDATA[Rudolf Stadler]]></dc:creator>
		<pubDate>Thu, 30 Apr 2015 11:26:54 +0000</pubDate>
				<category><![CDATA[Signaling Technology]]></category>
		<guid isPermaLink="false">http://wp.kruch.com/?p=7338</guid>

					<description><![CDATA[The new KRUCH signal pole with integrated service lift is the answer to new challenges in the field of maintenance of signalling systems for railways. The KRUCH signal pole with integrated service lift is a new revolutionary concept, where the maintenance people – riding on an electro-hydraulic platform – are lifted up to their site [&#8230;]]]></description>
										<content:encoded><![CDATA[<p align="LEFT">The new KRUCH signal pole with integrated service lift is the answer to new challenges in the field of maintenance of signalling systems for railways. The KRUCH signal pole with integrated service lift is a new revolutionary concept, where the maintenance people – riding on an electro-hydraulic platform – are lifted up to their site of operation to service the signals in a height of 5 m to 7 m above ground. Compared to common methods for servicing signals the service time will be minimised, the safety at work will be vastly improved and vehicle-skylifts will not be needed anymore.</p>
<p align="LEFT"><strong>The advantages</strong></p>
<ul>
<li>Work safety in all conditions</li>
<li>Vastly improved working speed</li>
<li>No need of vehicle sky lift for signal maintenance</li>
<li>Unbeatable ROI</li>
<li>Retrofit for existing signals also available</li>
</ul>
<p><a href="https://www.youtube.com/watch?v=373uIbABhYs&amp;utm_source=concedis+MailService&amp;utm_medium=email&amp;utm_campaign=2015-03+Newsletter+EN&amp;utm_content=Mailing_8742087" target="_blank" rel="noopener noreferrer">View video now!</a></p>
]]></content:encoded>
					
					<wfw:commentRss>https://kruch.com/en/exchanging-a-signal-in-snow-storm-conditions/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
